FMCSA broker authority active, MC55843419.
Steel buildings.Moved right.
Steady loads, paid on time.
Loadhorn is a freight brokerage for prefabricated steel buildings: we arrange the flatbed carrier that hauls each load from the plant to the job site.
We are building our carrier network now.
Who we are
- Loadhorn LLC, a freight broker for steel buildings
- Based in Pittsburgh, PA
- Founders from the steel-building industry
- FMCSA broker authority active, MC55843419
Flatbed only
Steel buildings ride on flatbeds. That is the only trailer Loadhorn books.
Flatbed
Frames, panels and trim, tarped, strapped and chained.
Built for carriers
Our standard, in writing.
Net 15 from a clean POD
Standard pay is net 15 from a clean proof of delivery.
Detention passed through
2 hours free, then detention is billed to the shipper and passed through to you.
The whole load, up front
Dimensions, weight, tarping, securement and the unloading equipment on site, before you accept. Tarp pay is on the rate confirmation when tarps are required.
Through your dispatcher
Check calls through your dispatcher, and one Loadhorn contact who knows your truck.
How it works for shippers
From the plant to the job site.
Step 1: Send the load
Tell us the building or load, the pickup plant, the job site and the target ship date. Our platform logs every detail.
Step 2: We match a vetted carrier
A flatbed carrier whose authority and insurance we verify before its first load and keep monitoring, with tarps, securement and site equipment confirmed.
Step 3: Stay updated
Check calls and updates go through the carrier's dispatcher.
Step 4: One invoice
Delivered and documented, then one invoice with every charge explained.
The market we serve
Trucking runs on small fleets.
Fleet size
91.5%
of US carriers run 10 trucks or fewer.
Source: American Trucking Associations, American Trucking Trends 2025 (all carriers, including private fleets)Nearly
580,000
active for-hire carriers.
Source: American Trucking AssociationsFlatbed spot rates
+31%
year over year, September 2026.
Source: DAT Freight and Analytics
Lanes
Loads out of four plants. Every plant delivers to all 48 states.
Why we exist
Steel-building freight is its own trade.
A steel building ships as long frames, stacked panels, bundles of trim and boxes of hardware, often on more than one truck.
Loadhorn is a new brokerage started by people from the steel-building industry to get these loads right: details handled before the truck is booked, not after it is late.
Long pieces
Frames and panels run long, so the load plan has to account for every piece.
Tarps and securement
Finished panels and trim need the right tarps, straps and edge protection.
Job-site delivery
Deliveries go to job sites, not docks. Carriers do not unload; the receiver needs a forklift or crane.
Source: Industry standardOversize permits
Some pieces need oversize permits, planned routes and the right trailer.
Be first in line when loads start.
We contact carriers in the order they sign up. Shippers can request a quote.
