About Loadhorn
Built by people from the steel-building industry.
Our story
Loadhorn LLC was founded in 2026 by people from the steel-building industry. We kept watching the same freight problems: trucks booked without the right tarps, deliveries to job sites with nothing on hand to unload them, and carriers left waiting for hours without being paid for it.
So we built a brokerage on a technology platform from day one.
Loadhorn LLC is based in Pittsburgh, PA. Loadhorn LLC is a freight broker (property broker), not a motor carrier. We arrange the freight; the motor carrier hauls it.
What we believe
Three rules we run on.
Pay carriers fast and fairly.
Net 15 from a clean POD is our standard, and detention gets passed through to the carrier who waited.
Tell the truth about every load.
Dimensions, weight, tarping, securement and the equipment on site, stated before anyone accepts the load.
Grow only as fast as carrier trust allows.
We would rather arrange fewer loads well than more loads badly.
Where we are today
Building the carrier network first.
FMCSA broker authority active, MC55843419.
FMCSA broker authority active, MC55843419. We are building our carrier network now.
