Start the job site delivery checklist with four details
Use one sheet for each building order, even when the shipment has several trucks. Record the exact site address, the buyer's working phone number, the unloading equipment that is confirmed, and whether a 53-foot flatbed can reach the unloading point. These details prevent the most common last-mile surprises.
Ask for a GPS pin as well as the postal address. A new subdivision, acreage driveway, or gate entrance can be different from the address a mapping app chooses. Name the person who can answer a call at the site, and give that person the delivery window, not an unsupported promise of an exact arrival minute.
- Site address and GPS pin
- Buyer or site contact with a working phone number
- Unloading equipment and operator confirmed
- 53-foot flatbed access confirmed
Walk the truck route before delivery day
Look at the final approach, not only the highway route. Ask about narrow roads, bridge limits, soft shoulders, low overhead lines, locked gates, turns, and a turnaround. A clear route on a dry day can become unsuitable after rain or construction activity.
Have the site contact send current photos from the entrance through the unloading area. Mark where the truck should stop and where equipment and crew will stand. If the site is doubtful, agree on an alternate meeting or staging location before the appointment is made. That is much easier than deciding with a loaded truck waiting at a gate.
Make the unloading plan specific
Many manufacturers' delivery terms put unloading equipment and crew on the receiver. The exact equipment depends on the load, the manufacturer, and the contract. Confirm the equipment type, its capacity and reach, the fork or rigging plan, the operator, and the crew that will guide bundles to their landing area.
Keep a clear unloading zone. Move personal vehicles, pallets, scrap, and loose material before the truck arrives. Decide where frames, panels, trim, and hardware will go so that the crew does not have to reorganize a crowded site while the truck waits. Review the packing list so the receiver knows what is expected.
Confirm the people and the paperwork
Tell the receiver who may sign the delivery receipt and who should be called if there is visible damage or a shortage. The signer should compare visible bundles and counts with the bill of lading and make a clear note before signing if something is missing or damaged. Take photos of the condition, labels, and any notation.
For a balance-due order, confirm the shipper's written payment instructions and the named verifier before the truck arrives. Keep the verifier reachable. Do not leave a decision about release, payment type, or a missing contact for the delivery crew to solve at the site.
How Loadhorn handles the delivery file
Before a truck is booked, Loadhorn builds a load file with the pieces, dimensions, weight, pickup plant, delivery site, delivery window, cash on delivery (COD) terms when applicable, and possible extra charges. The carrier is booked against that file so freight, site, and payment facts are not guessed.
Before booking a job-site delivery, Loadhorn confirms the unloading equipment and site access. Before delivery, it gets written confirmation that the site is ready and that agreed equipment and access are available.
Talk through the load
How Loadhorn handles it
Request a written quote with the building and delivery details, or call or email to discuss the load file.
Questions
Frequently asked questions
What should be on a job site delivery checklist?
Who should be at the site?
What if access is uncertain?
Keep reading
Related guides
Unloading steel building deliveries safely
Plan unloading steel building deliveries with the right equipment, crew, landing area and receipt process before the flatbed reaches the job site.
Rural job site delivery for steel buildings
Plan rural job site delivery for a steel building by checking final-mile access, ground, gates, clearance, turns and a safe unloading location.
Delivery appointment and buyer confirmation
Set a steel building delivery appointment with written buyer confirmation, a practical delivery window, site readiness and a clear day-of contact plan.
Bill of lading for a steel building shipment
Learn how a bill of lading identifies steel building bundles, piece counts, pickup and delivery parties, and the record needed for proof of delivery.