Name accessorial charges before booking
Ask for a written explanation of the charges that could apply to this load, even if none is expected. Detention is waiting beyond the agreed free time. Truck ordered not used, often called TONU, concerns a booked truck that cannot take the load as planned. Layover concerns a truck held into a later period. Tarp pay covers agreed tarp work. Redelivery and storage can follow a failed receiving attempt. The precise trigger and amount belong in the written terms, not in an assumption that everyone uses the same schedule.
For a building order, review these terms by truck. A frame load could be ready while the panel truck is delayed by production. A buyer may receive the first flatbed but lack room for the second. If the office books all loads under one loose instruction, it can be difficult to tell which truck incurred which event. Keep the appointment, site contact, and charge terms attached to the individual load file.
Prevent waiting at each end
At the plant, confirm that the actual pieces are staged, the loading team knows the appointment, and the bill of lading can be issued for the truck that is arriving. An unfinished order or a blocked loading bay can turn carrier time into a cost before the freight leaves. If production slips, tell the broker before the carrier starts toward the plant. A changed pickup date should be written down so no one later argues about whether the truck was still expected.
At the job site, confirm passable access, the unloading area, equipment, operator, crew, and a reachable receiver. A telehandler booked for the afternoon is not useful if the truck has a morning appointment. Check whether the site can handle every truck planned for that day. Where access is uncertain, agree on a safe alternate delivery point and the party who may authorize it before dispatch.
Document the event that triggers a charge
When a truck waits, record arrival and departure times and the reason for delay. When a truck is turned away, preserve the site contact's instruction, the carrier's dispatcher report, and any revised appointment. When a tarp requirement is added, record the changed instruction and agreed pay before the work starts. Documentation protects the shipper as well as the carrier: it can show that a charge applies or that it was based on the wrong event.
Ask finance to compare the invoice with the signed rate confirmation and the event record. A label alone is not an explanation. If an invoice says layover, the file should show why the truck stayed and what instruction it received. If it says redelivery, the file should identify the failed attempt and the approved second trip. This prevents a steel building's multiple loads from being lumped into one unexplained project cost.
How Loadhorn states and bills extra charges
Loadhorn puts the agreed rate and terms on a signed rate confirmation for every load. Tarp pay and terms for detention, truck ordered not used, and layover are stated there. Truck ordered not used, layover, redelivery, and storage follow those written terms. After two free hours on site, detention is billed to the shipper as agreed and passed through to the carrier. Arrival and departure times are recorded to document it.
Loadhorn builds possible extra charges into its load file before booking and bills from a matched packet of the accepted rate confirmation, bill of lading (BOL), and signed proof of delivery (POD). It sends one invoice per load with every charge explained. If a site problem changes the plan, Loadhorn keeps a written exception record with verified facts and the next-update time. The shipper can then connect the charge to a specific instruction and event rather than trying to reconstruct the day from memory.
Talk through the load
How Loadhorn handles it
Request a written quote with the building and delivery details, or call or email to discuss the load file.
Questions
Frequently asked questions
Are accessorial amounts the same on every flatbed load?
What record helps resolve a detention question?
Can a charge arise if the plant is not ready?
Keep reading
Related guides
Detention time trucking at job sites
Avoid detention time trucking charges at steel building job sites by confirming access, unloading equipment, crew, appointment contacts and records.
TONU trucking, redelivery and layover
Understand TONU trucking, layover, redelivery and storage terms for steel buildings, and prevent disputes with a ready site and written instructions.
How to request a steel building freight shipping quote
Prepare a freight shipping quote request for a steel building with the piece details, plant, job site, delivery window, and terms a broker needs.
Proof of delivery and invoicing for steel buildings
Understand proof of delivery for steel building freight and how a signed receipt, bill of lading, rate terms, and invoice should line up per load.