Understand TONU trucking terms before dispatch
Truck ordered, not used describes a situation where a truck was arranged but cannot be used under the agreed circumstances. Layover generally concerns a delay that keeps the truck and its driver waiting into another period. Redelivery and storage can arise when material cannot be received as planned.
These labels do not create a standard charge by themselves. The trigger, amount, notice, and responsibility depend on the rate confirmation and related agreements. Read the written terms before booking, and make sure the shipper, site contact, and buyer understand the conditions that can change the plan.
Prevent a truck ordered, not used event
Do not release a truck against an incomplete delivery plan. Confirm the site address, access route, appointment window, unloading equipment, operator, crew, and payment or release requirements. If a site has an uncertain gate, wet ground, or missing equipment, solve it before the carrier is committed.
Keep a single source for changes. A buyer may tell a dealer one thing while a contractor tells the plant another. Record the final instruction in writing and send it to the people who need it. When a material change appears, raise it immediately rather than hoping the truck can adapt at the last minute.
Handle a failed delivery carefully
If the truck cannot enter, unload, or receive release, capture the facts before assigning blame. Record the arrival location, time, access condition, people contacted, equipment status, and what the site can do next. Ask the authorized shipper contact for a written decision under the agreed terms.
Possible options can include waiting, holding, returning, storing, or setting a new delivery plan. Each option has operational consequences, and some can add charges under the applicable contract. Keep the carrier dispatcher and site contact informed of the verified decision, not an assumption about what will happen.
Set up a redelivery plan
A new appointment should fix the reason the first handoff did not happen. Recheck the route, ground, gate, equipment, crew, payment instructions, and the receiver's authority to sign. Do not merely repeat the old date if the site conditions have not changed.
Give the receiver a fresh written brief. Include the updated window, contact chain, unloading plan, and landing area. If material will be staged elsewhere, confirm who has permission to use that location and who is responsible for handling there. This creates a workable second attempt rather than a repeat of the first problem.
Before confirming the replacement window, ask the receiver to state what changed. It may be equipment repair, a reopened gate, firmer ground, a revised crew schedule, or a new payment contact. Put that answer beside the new appointment. A future reader should be able to see why the revised plan is more likely to work, rather than finding only another date in the file.
How Loadhorn sets the terms
Truck ordered not used, layover, redelivery, and storage follow the terms written on Loadhorn's signed rate confirmation. Tarp pay is also stated on that confirmation.
Before a truck is booked, Loadhorn builds a complete file including the delivery site, delivery window, cash on delivery (COD) terms when applicable, and extra charges that may apply.
After a disrupted delivery, review the file before sending the next truck. Record the site condition, contact issue, equipment problem, or instruction that changed. Then update the practical brief for the receiver. A lesson that stays only in a phone call is easy to lose when a different person handles the second appointment.
Talk through the load
How Loadhorn handles it
Request a written quote with the building and delivery details, or call or email to discuss the load file.
Questions
Frequently asked questions
What does TONU trucking mean?
What causes redelivery?
Where are Loadhorn's redelivery terms stated?
Keep reading
Related guides
Detention time trucking at job sites
Avoid detention time trucking charges at steel building job sites by confirming access, unloading equipment, crew, appointment contacts and records.
Job site delivery checklist for steel buildings
Use this job site delivery checklist to confirm access, unloading equipment, contacts and payment before steel building freight arrives.
Freight delay updates for steel building shipments
Handle a steel building freight delay with verified facts, a named owner, a next-update time and a plan for the crew, site and other trucks.
Freight accessorial charges on steel building loads
Plan accessorial charges for steel building freight, including detention, truck ordered not used, layover, tarp pay, storage, and redelivery terms.