Understand detention time trucking charges at the site
A truck can arrive at a site that has no equipment operator, a locked gate, wet ground, a missing crew, or an inaccessible unloading area. A payment or release question can also stop the handoff. These are site problems first, but they can become freight-cost disputes if nobody records what happened.
Do not assume a short delay stays short. A machine that is still on another task, a crew waiting for instructions, or a gate contact who does not answer can consume the delivery window quickly. Give the site a simple readiness checklist and a backup contact before the appointment.
Prepare the site before the truck arrives
Confirm the unloading equipment, qualified operator, crew, access route, open gate, and landing area. Keep the truck route clear of parked vehicles and stage materials so the crew can work without first moving unrelated items. If rain or a construction change affects ground conditions, report it early.
The receiver should understand the packing sequence and know where each bundle will land. Equipment availability alone does not make a site ready. The operator needs a safe setup area, the crew needs room to guide and secure the load, and the receipt signer needs the bill of lading and a way to record exceptions.
Record arrival and departure facts
Use a simple log for gate arrival, unloading start, unloading finish, and departure. Note a delay's cause, the person contacted, and the next action. A factual record is more useful than a general statement that the truck waited too long.
Ask questions while the details are fresh. Was the truck at the agreed location? Was the site ready? Was the equipment present? Did an access or payment issue change the plan? Keep this record with the signed delivery receipt and site communications so the shipper can review a charge against the written terms.
Address a delay without guessing
Tell the carrier's dispatcher what is verified and when the site expects a decision. Do not promise an unloading time that the site cannot support. If the problem cannot be solved, review the agreed terms and obtain direction from the people authorized to change the plan.
A delay may lead to detention, layover, storage, return freight, or redelivery charges when the applicable contract states them. The amounts and triggers are not standard. Read the rate confirmation and related written terms for the actual load before making a decision.
How Loadhorn documents detention
After 2 free hours on site, Loadhorn bills detention to the shipper as agreed and passes it through to the carrier. Arrival and departure times are recorded so detention is documented, not argued.
Every Loadhorn load has a signed rate confirmation stating the agreed rate and terms, including detention terms when applicable. No load moves without one.
When the site has to change a plan, keep a copy of the message that explains the reason and the replacement instruction. It gives the receiving team a reference for the next delivery and gives the shipper facts to compare with the time record. Clear notes do not remove a charge, but they make it possible to discuss the actual event rather than a vague recollection.
Talk through the load
How Loadhorn handles it
Request a written quote with the building and delivery details, or call or email to discuss the load file.
Questions
Frequently asked questions
What is detention time trucking?
How can a job site avoid detention?
How is detention documented by Loadhorn?
Keep reading
Related guides
Job site delivery checklist for steel buildings
Use this job site delivery checklist to confirm access, unloading equipment, contacts and payment before steel building freight arrives.
Delivery appointment and buyer confirmation
Set a steel building delivery appointment with written buyer confirmation, a practical delivery window, site readiness and a clear day-of contact plan.
TONU trucking, redelivery and layover
Understand TONU trucking, layover, redelivery and storage terms for steel buildings, and prevent disputes with a ready site and written instructions.
Freight accessorial charges on steel building loads
Plan accessorial charges for steel building freight, including detention, truck ordered not used, layover, tarp pay, storage, and redelivery terms.